C-MOLD

Top
Bottom No Frames

   Table of Contents
Cover page
SUMMARY
Flow Analysis Report
BACKGROUND
Cooling Analysis Report
Shrinkage & Warpage Analysis Report
RESULTS
Part surface/Thickness
Recommended ram-speed
Melt-front advancement
Melt-front advancement animation
Air Traps and Weld Lines
Pressure trace at entrance
Pressure at approximately 98 % fill
Clamp force
Bulk temperature (end of filling)
Time-to-cool after filling
Volumetric shrinkage (end of process)
CONCLUSION